Spatial plan with special purpose for the coastal area of Montenegro adopted in 2018. provides the basis for the implementation of investment projects in the Free Zone of the Port of Bar.
DEVELOPMENT PROJECTS
IMPROVEMENT OF THE INFRASTRUCTURE IN THE PORT OF BAR:
1. EXTENSION OF VOLUJICA COAST AT THE DRY BULK TERMINAL
Produžetak obale Volujica (166×30 m) i novo otvoreno skladište (166×50 m) na Terminalu za rasute terete.
2. EXTENSION OF QUAY AT THE PASSENGER TERMINAL
The extension of the quay at the Passenger Terminal will improve the accessibility of the port with a focus on medium / large Ro-Pax ships (with bigger draft) and cruisers in the Port of Bar.
The dimensions of the new part of the coast are: length - 432.85 m; Beam: 30.00 m.
3. DEEPENING OF A PART OF THE PORT AQUATORIUM
Deepening of the Port of Bar aquatorium in the areas of the Volujica coast, the southern coast of pier 3, the waterway and the turning pojnt with the aim of creating the possibility of receiving of Post Panamax Plus ships, 335 m long with a draft of 13,5 m on the Volujica coast and receiving of ships with a draft of 10,5 m on the southern coast of the Pier 3.
4. RECONSTRUCTION OF RAILWAY INFRASTRUCTURE
5. HANDLING AND STORAGE OF LIQUID CARGO
Construction of LNG handling and storage facilities.
6. CONSTRUCTION OF WAREHOUSE FOR GENERAL CARGO
7. CONTRACTION OF RESERVOIRS FOR ACETIC ACID
8. DEVELOPMENT OF NEW IT SERVICES
The Port Information System (PCS) was developed in 2014 (updated in 2015 and 2016) and it in accordance with EU Directive 65/2010.
Preparing for Maritime Single Window.
DEVELOPMENT AREAS
PORT ZONE - GRAINS TERMINAL
- the available area for the construction of grain silo with capacity of 30 000 t, with a mill and system for bags stuffing and palletizing;
- state of infrastructure: infrastructure partially constructed area;
PORT ZONE – PRODUCTION, TRADE AND BUSINESS SYSTEM
- the available area in the Production, Trade and business system extends to 8.5 ha;
- the purpose according to the SP (Spatial Plan): development of different forms of productive, commercial and business activities which refer to import-export, production and commerce;
za uvozno–izvozne poslove, proizvodnju i trgovinu; - average surface of urban plot extends to 3000 sqm;
- state of infrastructure: infastructure partially constructed or non -constructed area;
PORT ZONE- CONSUMER GOODS TERMINAL
- the available area on which, according to the SP, it is intended the possibility of the cold storage plant construction with surface of 3800 sqm;
- state of infrastructure: infrastructure partially constructed area;
PORT ZONE- LIQUID CARGO AND GAS TERMINAL (HILL VOLUJICA)
- the available area: 287 000 sqm;
- state of infrastructure: infrastructure partially constructed area;
PORT ZONE- DRY BULK CARGO TERMINAL
- the available development area (7.8 ha), which will be created on the north side of the hill Volujica, after completion of works on the exploitation of technical aggregates stone;
- purpose according to the SP: warehouse for dry bulk cargo;
- state of infrastructure: infrastructure partially constructed area;
PORT ZONE- BUSINESS CENTER
- the available area (approximately 11 000 sqm) is intended, according to the SP, for various business development activities;
- currently green area situated between Customs office and Centrojadran building.
- state of infrastructure: infrastructure partially constructed area;
PRODUCTION ZONE- PRODUCTION ZONE POLJE
- the available area of 10.5 ha is intended, according to the SP, for the development of various production programs;
- state of infrastructure: infrastructure partially constructed area;